A 75-page failure analysis report revealed that the 'American flag blue' liner of the Lincoln Memorial Reflecting Pool failed in at least 85 places. The damage was attributed to poor construction and improper materials used during a renovation project.
The failure occurred because the Trump administration rushed the project to meet a July 4 deadline, resulting in the pool being refilled before the liner had properly cured.